Grouting the Fault/Fracture System (Under Construction)
Each borehole. drilled into the fault
was fitted with a pneumatic packer. The packer was emplaced at the total depth of the hole. Kaolin-based grout was mixed in a small batch
plant and pumped through the packer using a small moyno pump. The packer was then moved outward to the next zone.


Return to AESE